{"id":6108,"date":"2026-10-07T08:17:32","date_gmt":"2026-10-07T08:17:32","guid":{"rendered":"https:\/\/jmsdecor.com\/hotel-renovation-without-closing\/"},"modified":"2026-10-07T08:17:33","modified_gmt":"2026-10-07T08:17:33","slug":"hotel-renovation-without-closing","status":"publish","type":"post","link":"https:\/\/jmsdecor.com\/de\/hotel-renovation-without-closing\/","title":{"rendered":"Hotelrenovierung ohne Schlie\u00dfung: Ein K\u00e4ufer-Ratgeber in Phasen"},"content":{"rendered":"<p style=\"line-height: 1.8; margin-bottom: 28px;\">A hotel renovation usually means lost room nights, and lost room nights are lost revenue. The first question a hotel owner asks is how much of the building has to close while the work is done. Thin, light flexible stone panels offer one answer: they fix over the existing wall and let the work move room by room.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A closed floor takes rooms off sale, and it can push a guest to a hotel down the street. A phased programme keeps the doors open while the finish is replaced. The panel a team picks decides how far that phasing can go.<\/p>\n<blockquote style=\"border-left: 4px solid #1452FF; background-color: #f9f9f9; padding: 15px 20px; margin: 0 0 28px 0; line-height: 1.8;\"><p>A hotel renovation without closure is a scheduling problem first and a materials problem second. The right panel settles both at once.<\/p><\/blockquote>\n<h2 style=\"margin-top: 50px; margin-bottom: 30px; font-size: 28px; border-bottom: 2px solid #eee; padding-bottom: 10px; font-weight: 700;\">Planning a Hotel Renovation That Stays Open<\/h2>\n<figure style=\"margin: 0 0 36px 0;\"><img alt=\"Installing flexible stone on a hotel corridor wall\" class=\"wp-image-5616\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/hyperrealistic-photography-hotel-corridor-during-renovation.webp\" width=\"1024\" height=\"1024\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px;\" \/><figcaption style=\"font-size: 14px; color: #666; margin-top: 10px; line-height: 1.6;\">A corridor can be finished in stages while the hotel runs.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The plan starts with the finish, because the finish decides the schedule. A wet trade such as plaster or microcement needs drying time, and drying time pushes a room out of use for days. A panel set with adhesive goes up without mortar or plaster, so a room can reopen the next morning.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The second input is weight. A stone wall adds load to the frame and the floor, and an old building may not carry much more. A light panel keeps the load low and removes the need for structural work before the finish goes on.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The third input is access. Guests walk the same corridors the crew has to work in, so the programme has to keep a clear route open. Work that creates dust or heavy waste slows that route and pushes guests around the building.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">These three inputs point the same way. A thin, light, adhesive-fixed panel lets a hotel refresh a floor without taking the whole hotel out of service.<\/p>\n<h2 style=\"margin-top: 50px; margin-bottom: 30px; font-size: 28px; border-bottom: 2px solid #eee; padding-bottom: 10px; font-weight: 700;\">The Cost of Closing a Floor<\/h2>\n<figure style=\"margin: 0 0 36px 0;\"><img alt=\"Flexible sandstone corridor feature wall\" class=\"wp-image-5834\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-wave-corridor.webp\" width=\"1248\" height=\"832\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px;\" srcset=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-wave-corridor.webp 1248w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-wave-corridor-300x200.webp 300w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-wave-corridor-1024x683.webp 1024w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-wave-corridor-768x512.webp 768w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-wave-corridor-18x12.webp 18w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-wave-corridor-600x400.webp 600w\" sizes=\"auto, (max-width: 1248px) 100vw, 1248px\" \/><figcaption style=\"font-size: 14px; color: #666; margin-top: 10px; line-height: 1.6;\">A finished corridor can reopen the same day it is done.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A closed room is a room that cannot be sold, and the loss runs for every night of the closure. That loss is easy to count once the dates are set against the room rate.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A full closure is the clearest case. Every room leaves the market at once, and the hotel runs on no revenue for the full length of the works. Few owners choose that route unless the building has to come down to the frame.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A floor-by-floor route is softer. One floor closes, the rest stays on sale, and the closure moves up the building. The loss is smaller, so the finish has to allow a clean stop and start at each floor.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 36px 0; font-size: 15px;\">\n<caption style=\"text-align: left; font-weight: 700; padding-bottom: 12px; font-size: 16px;\">Hotel renovation routes and what each one closes<\/caption>\n<thead>\n<tr style=\"background: #1452FF; color: #fff;\">\n<th style=\"text-align: left; padding: 12px; border: 1px solid #d0d7e6;\">Route<\/th>\n<th style=\"text-align: left; padding: 12px; border: 1px solid #d0d7e6;\">What it closes<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Full closure<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Every room, for the length of the works<\/td>\n<\/tr>\n<tr style=\"background: #f7f9fc;\">\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Floor by floor<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">One floor at a time, the rest stays on sale<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Room by room<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">A single room at a time, guests move around the work<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The room-by-room route is the softest of the three. A crew takes one room, finishes it and hands it back, then moves to the next. Guests stay in the building throughout, and revenue keeps coming in.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">That route only works with a panel that installs fast and clean. A finish that needs a wet mix, a long cure or heavy demolition breaks the rhythm and forces a floor to close.<\/p>\n<h2 style=\"margin-top: 50px; margin-bottom: 30px; font-size: 28px; border-bottom: 2px solid #eee; padding-bottom: 10px; font-weight: 700;\">How Flexible Stone Keeps Rooms Open<\/h2>\n<figure style=\"margin: 0 0 36px 0;\"><img alt=\"Hotel bedroom headboard in flexible stone\" class=\"wp-image-5835\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-bedroom-headboard.webp\" width=\"1248\" height=\"832\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px;\" srcset=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-bedroom-headboard.webp 1248w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-bedroom-headboard-300x200.webp 300w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-bedroom-headboard-1024x683.webp 1024w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-bedroom-headboard-768x512.webp 768w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-bedroom-headboard-18x12.webp 18w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-sandstone-bedroom-headboard-600x400.webp 600w\" sizes=\"auto, (max-width: 1248px) 100vw, 1248px\" \/><figcaption style=\"font-size: 14px; color: #666; margin-top: 10px; line-height: 1.6;\">A feature wall can be finished without a wet trade.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A hotel renovation that stays open depends on three qualities working together: low weight, low thickness and a simple adhesive fixing. Flexible stone carries all three, and each one feeds the schedule in its own way.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The panels weigh 1.5 to 6 kg per square metre, about one fifth of natural stone. A single fitter can move a full day of panels by hand and set them without lifting gear, which keeps the crew small and the corridor clear.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The depth runs from 2mm to 8mm. A thin sheet sits close to the old wall and adds almost nothing to the room. That keeps door sets, sockets and skirtings where they are instead of forcing a rebuild around a thick new layer.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The fixing uses a thin adhesive rather than a wet trade. There is no mortar, no plaster and no water to mix, and a crew can finish a wall at night and hand the room back the next morning.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The panels are cut with a knife or a small saw on site. Offcuts are light and small, so the waste leaves the room in a bag rather than a skip. That keeps the guest route clean and the fire exit clear.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Across a whole hotel the same panel serves every space, from a guest room to a lobby. A team that works on hospitality jobs can set out the finish area by area. The wider set of <a href=\"https:\/\/jmsdecor.com\/solution\/\">flexible stone solutions<\/a> shows how a finish is matched to each one.<\/p>\n<div class=\"wp-block-html cta-block\" style=\"background: #1a1a2e; border-radius: 10px; padding: 30px 4%; margin: 40px 0; display: flex; flex-wrap: wrap; align-items: center; justify-content: space-between; gap: 20px; box-shadow: 0 4px 20px rgba(0,0,0,0.1);\">\n<div style=\"flex: 1 1 200px; min-width: 200px;\">\n<div style=\"margin-top: 0; color: #ffffff !important; background: transparent !important; background-color: transparent !important; font-size: 28px; line-height: 1.3; font-weight: bold; border: none; padding: 0;\">Keep the Doors Open<\/div>\n<div style=\"font-size: 16px; color: #ffffff !important; background: transparent !important; line-height: 1.7; margin: 15px 0 25px 0;\">Send the room type and the finish you have in mind. We will confirm the panel, the fixing and the delivery plan for a phased programme.<\/div>\n<p style=\"margin-bottom: 0;\"><a href=\"https:\/\/jmsdecor.com\/contact\/\" rel=\"noopener\" style=\"display: inline-block; background: #ffffff; color: #000000; padding: 14px 28px; font-family: sans-serif; font-weight: bold; font-size: 16px; border-radius: 6px; text-decoration: none; transition: all 0.3s ease;\">Plan a Phased Refresh &rarr;<\/a><\/p>\n<\/div>\n<div style=\"flex: 0 1 240px; min-width: 150px; text-align: center;\"><img alt=\"Flexible marble tile cladding on a hotel spa reception wall\" class=\"wp-image-5836\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-spa-reception.webp\" width=\"1248\" height=\"832\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px; object-fit: cover;\" srcset=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-spa-reception.webp 1248w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-spa-reception-300x200.webp 300w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-spa-reception-1024x683.webp 1024w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-spa-reception-768x512.webp 768w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-spa-reception-18x12.webp 18w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-spa-reception-600x400.webp 600w\" sizes=\"auto, (max-width: 1248px) 100vw, 1248px\" \/><\/div>\n<\/div>\n<h2 style=\"margin-top: 50px; margin-bottom: 30px; font-size: 28px; border-bottom: 2px solid #eee; padding-bottom: 10px; font-weight: 700;\">A Panel That Fixes Over the Old Wall<\/h2>\n<figure style=\"margin: 0 0 36px 0;\"><img alt=\"Workers installing lightweight flexible stone panels\" class=\"wp-image-5626\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/construction-site-photo-of-workers-installing-lightweight-fl.webp\" width=\"1024\" height=\"1024\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px;\" \/><figcaption style=\"font-size: 14px; color: #666; margin-top: 10px; line-height: 1.6;\">A light panel goes onto the wall that is already there.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The biggest source of downtime in a refurbishment is demolition. Stripping a tiled wall is loud, dusty and slow, and it takes the room out of use for the strip and the rebuild. A panel that fixes over the old surface removes that step.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Flexible stone is thin enough to go straight over a sound existing wall. The old finish stays in place, and the new panel sits on top of it. The room keeps its size, and the wall keeps its line.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The panel is built from natural stone powder, an inorganic gel and a fibreglass mesh. The base is mineral rather than a coated surface, so the sheet holds its shape once it is fixed.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Where a corridor curves or a column stands in the wall, the panel bends to follow the line. The general minimum bend radius is about 200mm, set out in our guide to the <a href=\"https:\/\/jmsdecor.com\/flexible-stone-minimum-bend-radius\/\">flexible stone minimum bend radius<\/a>. A curve can be clad in one sheet instead of cut into small pieces.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Support materials travel with the panels. Adhesive, sealant and installation accessories come from the same factory, so the fixing suits the sheet and the crew is not chasing parts.<\/p>\n<h2 style=\"margin-top: 50px; margin-bottom: 30px; font-size: 28px; border-bottom: 2px solid #eee; padding-bottom: 10px; font-weight: 700;\">Phasing a Refurbishment Room by Room<\/h2>\n<figure style=\"margin: 0 0 36px 0;\"><img alt=\"Hotel restaurant feature wall in flexible marble\" class=\"wp-image-5838\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-restaurant-wall.webp\" width=\"1248\" height=\"832\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px;\" srcset=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-restaurant-wall.webp 1248w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-restaurant-wall-300x200.webp 300w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-restaurant-wall-1024x683.webp 1024w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-restaurant-wall-768x512.webp 768w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-restaurant-wall-18x12.webp 18w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-restaurant-wall-600x400.webp 600w\" sizes=\"auto, (max-width: 1248px) 100vw, 1248px\" \/><figcaption style=\"font-size: 14px; color: #666; margin-top: 10px; line-height: 1.6;\">Public spaces can be refreshed between service hours.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A phased programme splits the building into stages and finishes one stage before the next begins. The hotel stays open, and the cash from the open rooms funds the next stage.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A phased order suits a phased programme. The standard minimum order is 300 square metres, explained in our guide to <a href=\"https:\/\/jmsdecor.com\/flexible-stone-moq\/\">flexible stone MOQ<\/a>, and it can be adjusted for a smaller job. A first stage can cover one floor without a warehouse of stock.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Timing is easy to plan. A standard finish is sampled in 2 to 3 days, and a private colour takes about 7 days. A first bulk order runs 15 to 20 working days, and a repeat order runs 10 to 15 working days.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Delivery fits the same rhythm. Sea freight takes 15 to 35 days to North America and 25 to 45 days to Europe, and air freight takes 5 to 7 days. A first floor can fly in while the later stages sail, which keeps the opening date close.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 36px 0; font-size: 15px;\">\n<caption style=\"text-align: left; font-weight: 700; padding-bottom: 12px; font-size: 16px;\">What flexible stone brings to a phased refresh<\/caption>\n<thead>\n<tr style=\"background: #1452FF; color: #fff;\">\n<th style=\"text-align: left; padding: 12px; border: 1px solid #d0d7e6;\">Point<\/th>\n<th style=\"text-align: left; padding: 12px; border: 1px solid #d0d7e6;\">Figure<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Panel weight<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">1.5 to 6 kg per square metre<\/td>\n<\/tr>\n<tr style=\"background: #f7f9fc;\">\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Panel thickness<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">2mm to 8mm, thin enough to fix over old walls<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Standard minimum order<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">300 square metres, adjustable for a smaller job<\/td>\n<\/tr>\n<tr style=\"background: #f7f9fc;\">\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Sampling time<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">2 to 3 days for a standard finish<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Fire class<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">ASTM E84 Class A and EN 13501-1 Class A2<\/td>\n<\/tr>\n<tr style=\"background: #f7f9fc;\">\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Defect rate<\/td>\n<td style=\"padding: 12px; border: 1px solid #e3e8f0;\">Below 1 percent<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A repeat order is the quiet part of the plan. The colour formula and the molds are held free for five years, so a later stage matches the first without a fresh setup. A hotel can finish the upper floors a year on, and the stone still matches.<\/p>\n<h2 style=\"margin-top: 50px; margin-bottom: 30px; font-size: 28px; border-bottom: 2px solid #eee; padding-bottom: 10px; font-weight: 700;\">Fire Class and Guest Safety in Corridors<\/h2>\n<figure style=\"margin: 0 0 36px 0;\"><img alt=\"Minimalist hotel lobby with flexible stone cladding\" class=\"wp-image-5563\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/c32e00ec16467b4c6f43c708a7e13e86.jpg\" width=\"1200\" height=\"1600\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px;\" srcset=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/c32e00ec16467b4c6f43c708a7e13e86.jpg 1200w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/c32e00ec16467b4c6f43c708a7e13e86-225x300.jpg 225w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/c32e00ec16467b4c6f43c708a7e13e86-768x1024.jpg 768w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/c32e00ec16467b4c6f43c708a7e13e86-1152x1536.jpg 1152w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/c32e00ec16467b4c6f43c708a7e13e86-9x12.jpg 9w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/c32e00ec16467b4c6f43c708a7e13e86-600x800.jpg 600w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption style=\"font-size: 14px; color: #666; margin-top: 10px; line-height: 1.6;\">A lobby and a corridor carry a fire class as well as a finish.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">A corridor is an escape route, so its wall carries a fire class as well as a finish. A hotel owner has to show that the surface will not feed a fire, and the class is part of the submittal.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">JMS Decor flexible stone is tested to ASTM E84 Class A, with a flame spread index of 25 or below, and to EN 13501-1 Class A2 for European projects. The North American side is set out in our guide to <a href=\"https:\/\/jmsdecor.com\/astm-e84-class-a-wall-panels\/\">ASTM E84 Class A for wall panels<\/a>.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The factory runs a quality system to <a href=\"https:\/\/www.iso.org\/iso-9001-quality-management.html\" target=\"_blank\" rel=\"noopener\">ISO 9001<\/a> and <a href=\"https:\/\/www.iso.org\/iso-14000-family.html\" target=\"_blank\" rel=\"noopener\">ISO 14000<\/a>, and it holds BSCI and CE alongside. Production keeps a defect rate below 1 percent, which matters when a floor reopens in stages.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">Each order ships with the papers a project file needs. A certificate of analysis covers the material and the fire data, a certificate copy covers the class, and a first article inspection confirms the first sheet off the line. An installation guide and video travel with the panels too.<\/p>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The range is made by a <a href=\"https:\/\/jmsdecor.com\/\">flexible stone wall panel manufacturer<\/a> in a 8,000 square metre plant with five production lines. The factory was set up in 2015, and the team has worked in wall panels for more than 15 years. The wider set of articles sits under <a href=\"https:\/\/jmsdecor.com\/category\/applications\/\">flexible stone applications<\/a>.<\/p>\n<h2 style=\"margin-top: 50px; margin-bottom: 30px; font-size: 28px; border-bottom: 2px solid #eee; padding-bottom: 10px; font-weight: 700;\">Frequently Asked Questions on Hotel Refurbishment<\/h2>\n<figure style=\"margin: 0 0 36px 0;\"><img alt=\"Hotel elevator lobby feature wall\" class=\"wp-image-5837\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-elevator-lobby.webp\" width=\"1248\" height=\"832\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px;\" srcset=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-elevator-lobby.webp 1248w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-elevator-lobby-300x200.webp 300w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-elevator-lobby-1024x683.webp 1024w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-elevator-lobby-768x512.webp 768w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-elevator-lobby-18x12.webp 18w, https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/09\/flexible-marble-tile-elevator-lobby-600x400.webp 600w\" sizes=\"auto, (max-width: 1248px) 100vw, 1248px\" \/><figcaption style=\"font-size: 14px; color: #666; margin-top: 10px; line-height: 1.6;\">Public areas can be refreshed in stages too.<\/figcaption><\/figure>\n<p style=\"line-height: 1.8; margin-bottom: 28px;\">The questions below come up most often when a hospitality team plans a refresh, and each answer follows from the panel and the programme.<\/p>\n<div itemscope=\"\" itemtype=\"https:\/\/schema.org\/FAQPage\">\n<div class=\"faq-card\" itemprop=\"mainEntity\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Question\" style=\"margin-bottom: 20px; padding: 25px; background-color: #f9f9f9; border-left: 4px solid #1452FF; border-radius: 4px;\">\n<h3 itemprop=\"name\" style=\"margin-top: 0; margin-bottom: 15px; font-weight: 700; line-height: 1.3; font-size: 18px;\">Can a hotel renovation run without closing the hotel?<\/h3>\n<div itemprop=\"acceptedAnswer\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Answer\" style=\"color: #444;\">\n<p itemprop=\"text\" style=\"line-height: 1.8; margin-bottom: 0;\">It can run room by room. Flexible stone panels fix over the old wall on a dedicated adhesive, so a crew can finish one room, hand it back and move on. The hotel stays open and the open rooms keep earning through the works.<\/p>\n<\/div>\n<\/div>\n<div class=\"faq-card\" itemprop=\"mainEntity\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Question\" style=\"margin-bottom: 20px; padding: 25px; background-color: #f9f9f9; border-left: 4px solid #1452FF; border-radius: 4px;\">\n<h3 itemprop=\"name\" style=\"margin-top: 0; margin-bottom: 15px; font-weight: 700; line-height: 1.3; font-size: 18px;\">How much weight does the panel add to a wall?<\/h3>\n<div itemprop=\"acceptedAnswer\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Answer\" style=\"color: #444;\">\n<p itemprop=\"text\" style=\"line-height: 1.8; margin-bottom: 0;\">The panels weigh 1.5 to 6 kg per square metre, which is about one fifth of natural stone. On a refit that low figure cuts the load on the frame and the floor, so the wall behind it rarely needs extra support.<\/p>\n<\/div>\n<\/div>\n<div class=\"faq-card\" itemprop=\"mainEntity\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Question\" style=\"margin-bottom: 20px; padding: 25px; background-color: #f9f9f9; border-left: 4px solid #1452FF; border-radius: 4px;\">\n<h3 itemprop=\"name\" style=\"margin-top: 0; margin-bottom: 15px; font-weight: 700; line-height: 1.3; font-size: 18px;\">Does the old tile or plaster have to come off?<\/h3>\n<div itemprop=\"acceptedAnswer\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Answer\" style=\"color: #444;\">\n<p itemprop=\"text\" style=\"line-height: 1.8; margin-bottom: 0;\">Not always. A sound existing wall can take the panel directly, which removes the demolition and its dust. The wall has to be clean, dry and firm, and a quick check on site decides whether a small amount of prep is needed first.<\/p>\n<\/div>\n<\/div>\n<div class=\"faq-card\" itemprop=\"mainEntity\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Question\" style=\"margin-bottom: 20px; padding: 25px; background-color: #f9f9f9; border-left: 4px solid #1452FF; border-radius: 4px;\">\n<h3 itemprop=\"name\" style=\"margin-top: 0; margin-bottom: 15px; font-weight: 700; line-height: 1.3; font-size: 18px;\">Can the order be split across the stages?<\/h3>\n<div itemprop=\"acceptedAnswer\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Answer\" style=\"color: #444;\">\n<p itemprop=\"text\" style=\"line-height: 1.8; margin-bottom: 0;\">Yes. The standard minimum order is 300 square metres and it can be adjusted for a smaller stage. The colour formula and the molds are held free for five years, so a later order matches the first floor without a fresh setup.<\/p>\n<\/div>\n<\/div>\n<div class=\"faq-card\" itemprop=\"mainEntity\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Question\" style=\"margin-bottom: 20px; padding: 25px; background-color: #f9f9f9; border-left: 4px solid #1452FF; border-radius: 4px;\">\n<h3 itemprop=\"name\" style=\"margin-top: 0; margin-bottom: 15px; font-weight: 700; line-height: 1.3; font-size: 18px;\">What fire class do the corridor panels carry?<\/h3>\n<div itemprop=\"acceptedAnswer\" itemscope=\"\" itemtype=\"https:\/\/schema.org\/Answer\" style=\"color: #444;\">\n<p itemprop=\"text\" style=\"line-height: 1.8; margin-bottom: 0;\">The range is tested to ASTM E84 Class A with a flame spread index of 25 or below, and to EN 13501-1 Class A2 for Europe. A certificate and test report travel with the order, ready for the project file.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"wp-block-html cta-block\" style=\"background: #1a1a2e; border-radius: 10px; padding: 30px 4%; margin: 40px 0; display: flex; flex-wrap: wrap; align-items: center; justify-content: space-between; gap: 20px; box-shadow: 0 4px 20px rgba(0,0,0,0.1);\">\n<div style=\"flex: 1 1 200px; min-width: 200px;\">\n<div style=\"margin-top: 0; color: #ffffff !important; background: transparent !important; background-color: transparent !important; font-size: 28px; line-height: 1.3; font-weight: bold; border: none; padding: 0;\">Refresh Without Closing<\/div>\n<div style=\"font-size: 16px; color: #ffffff !important; background: transparent !important; line-height: 1.7; margin: 15px 0 25px 0;\">Tell us the floor count and the finish, and we will map the panel, the phase and the delivery for a hotel that stays open.<\/div>\n<p style=\"margin-bottom: 0;\"><a href=\"https:\/\/jmsdecor.com\/contact\/\" rel=\"noopener\" style=\"display: inline-block; background: #ffffff; color: #000000; padding: 14px 28px; font-family: sans-serif; font-weight: bold; font-size: 16px; border-radius: 6px; text-decoration: none; transition: all 0.3s ease;\">Send the Room Schedule &rarr;<\/a><\/p>\n<\/div>\n<div style=\"flex: 0 1 240px; min-width: 150px; text-align: center;\"><img alt=\"Luxury hotel wall cladding for a hospitality project\" class=\"wp-image-5615\" src=\"https:\/\/jmsdecor.com\/wp-content\/uploads\/2026\/07\/hyperrealistic-architectural-photography-elegant-dubai-5star.webp\" width=\"1024\" height=\"1024\" decoding=\"async\" loading=\"lazy\" style=\"width: 100%; height: auto; border-radius: 8px; object-fit: cover;\" \/><\/div>\n<\/div>\n<p><script type=\"application\/ld+json\" id=\"evo301-geo-ai-block\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"CreativeWork\",\n  \"name\": \"Hotel Renovation Without Closing a Floor: A Buyer's Guide\",\n  \"definition\": \"A hotel renovation without closure is a phased programme that refreshes a hotel while it stays open. Flexible stone panels support it because they are thin, light and fixed with adhesive, so a crew can finish one room and hand it back before moving to the next.\",\n  \"data_statements\": [\n    \"Flexible stone panels weigh 1.5 to 6 kg per square metre, which is about one fifth of natural stone.\",\n    \"The panels run from 2mm to 8mm, thin enough to fix over a sound existing wall without demolition.\",\n    \"The standard minimum order is 300 square metres and can be adjusted for a smaller stage of the programme.\",\n    \"A standard finish is sampled in 2 to 3 days, a first bulk order runs 15 to 20 working days and a repeat order runs 10 to 15 working days.\",\n    \"The range is tested to ASTM E84 Class A and EN 13501-1 Class A2, with a production defect rate below 1 percent.\"\n  ],\n  \"qa_concise\": [\n    {\"q\": \"Can a hotel renovation run without closing the hotel?\", \"a\": \"It can run room by room, because the panels go over the old wall on a dedicated adhesive, so the hotel stays open.\"},\n    {\"q\": \"How much weight does the panel add to a wall?\", \"a\": \"The panels weigh 1.5 to 6 kg per square metre, about one fifth of natural stone.\"},\n    {\"q\": \"Does the old tile have to come off?\", \"a\": \"Not always. A sound existing wall can take the panel directly, which removes the demolition and its dust.\"},\n    {\"q\": \"Can the order be split across the stages?\", \"a\": \"Yes. The minimum order is 300 square metres and can be adjusted, and the colour formula is held free for five years.\"}\n  ]\n}\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An applications guide to a hotel renovation that stays open: the cost of closing a floor, how a thin light adhesive-fixed panel keeps rooms open, fixing over the old wall, and phasing the works room by room.<\/p>","protected":false},"author":1,"featured_media":5833,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Hotel Renovation Without Closing: A Phased Buyer's Guide","rank_math_description":"A hotel renovation does not have to close the building. See how thin, light flexible stone panels let a crew refresh rooms and corridors one at a time.","rank_math_focus_keyword":"hotel renovation","rank_math_robots":"","rank_math_canonical_url":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_twitter_title":"","rank_math_twitter_description":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","_yoast_wpseo_canonical":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_aioseo_title":"","_aioseo_description":"","_aioseo_keywords":"","_aioseo_robots_default":"","_aioseo_robots_noindex":"","_aioseo_og_title":"","_aioseo_og_description":"","_aioseo_twitter_title":"","_aioseo_twitter_description":"","aiosp_title":"","aiosp_description":"","aiosp_keywords":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_analysis_target_kw":"","_seopress_robots_canonical":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_genesis_title":"","_genesis_description":"","_genesis_canonical":"","_genesis_noindex":"","_genesis_nofollow":"","slim_seo":""},"categories":[214],"tags":[280,281,278,64,279,282],"class_list":["post-6108","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-applications","tag-hospitality-wall-cladding","tag-hotel-corridor-wall-panels","tag-hotel-refurbishment","tag-hotel-renovation","tag-phased-hotel-renovation","tag-renovate-without-closing"],"_links":{"self":[{"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/posts\/6108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/comments?post=6108"}],"version-history":[{"count":1,"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/posts\/6108\/revisions"}],"predecessor-version":[{"id":6109,"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/posts\/6108\/revisions\/6109"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/media\/5833"}],"wp:attachment":[{"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/media?parent=6108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/categories?post=6108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jmsdecor.com\/de\/wp-json\/wp\/v2\/tags?post=6108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}